{"id":2552,"date":"2026-01-14T07:43:20","date_gmt":"2026-01-13T23:43:20","guid":{"rendered":"https:\/\/www.weldmc.com\/news\/case-study-how-wuxi-abk-boosted-wind-tower-production-by-300\/2552\/"},"modified":"2026-01-30T15:05:01","modified_gmt":"2026-01-30T07:05:01","slug":"case-study-how-wuxi-abk-boosted-wind-tower-production-by-300","status":"publish","type":"post","link":"https:\/\/www.weldmc.com\/de\/nachrichten\/case-study-how-wuxi-abk-boosted-wind-tower-production-by-300\/2552\/","title":{"rendered":"Entschl\u00fcsselung des 300%-Leistungssprungs von WUXI ABK: Eine Blaupause f\u00fcr die Windturmherstellung"},"content":{"rendered":"<p>Manual welding has long held wind tower lines back: uneven quality, drawn-out cycles, and heavy labor costs. In this case, replacing those bottlenecks with an integrated automated welding line built around Welding Manipulators, Positioners, and Fit-Up Rotators delivered a 300% productivity jump alongside better weld integrity and lower operating costs. The sections below cover the bottlenecks, the WUXI ABK equipment we deployed, how the rollout unfolded, the numbers it produced, and practical takeaways with answers to common questions.<\/p>\n<h2>The Challenge: Bottlenecks in Traditional Wind Tower Fabrication<\/h2>\n<p>Wind tower manufacturing demands precision, scale, and efficiency. Traditional lines often struggle. Manual welding introduces variation, stretches cycle time, and increases dependency on labor. Those factors clog the production flow, turning into missed revenue and a weaker competitive position. The situation calls for a step-change solution, not incremental tweaks.<br \/>\nWenn Sie interessiert sind, schauen Sie unter \u300a<a href=\"https:\/\/www.weldmc.com\/de\/nachrichten\/wind-tower-welding-challenges-how-advanced-hydraulic-lifting-systems-boost-production-by-40\/1834\/\">Wind Tower Welding Challenges How Advanced Hydraulic Lifting Systems Boost Production By 40<\/a>\u300b.<\/p>\n<h2>WUXI ABK&#8217;s Solution: Engineering an Integrated Automated Welding Line<\/h2>\n<p>Recognizing the critical need for enhanced efficiency, WUXI ABK MACHINERY CO., LTD partnered with a leading wind tower manufacturer. We designed and implemented a bespoke automated welding line. This end-to-end solution integrated state-of-the-art <a href=\"https:\/\/www.weldmc.com\/de\/product\/schweismanipulator\/\">Manipulator zum Schwei\u00dfen<\/a>s, precision Welding Positioners, and robust Fit-Up Rotator Suppliers. We specifically chose these for their ability to handle the large-scale and demanding requirements of wind tower components. The strategy involved a complete overhaul of existing manual processes, introducing advanced automation. This streamlined material handling, optimized welding parameters, and ensured consistent, high-quality welds across all production stages. This section details the specific WUXI ABK equipment deployed and how each component contributed to creating a cohesive and highly efficient manufacturing ecosystem.<\/p>\n<h3>1. Precision Welding Manipulators for Longitudinal and Circumferential Seams<\/h3>\n<p>Our Welding Manipulator is a column and boom welding system designed for precise longitudinal and circumferential seam welding. It utilizes a high-strength box-beam structure, linear guideways, and cycloidal reducers. Stepless speed control ensures stable operation with positioning accuracy of \u00b10.1 mm\/m. Selected models offer 360-degree column rotation and motorized travel. A brake motor, anti-fall safety pins, and full electrical protection ensure safe operation. Optional features include flux recovery, real-time monitoring, seam tracking, and automated parameter control.<\/p>\n<h4>Welding Manipulator Specifications:<\/h4>\n<table>\n<thead>\n<tr>\n<th style=\"text-align: left;\">Modell<\/th>\n<th style=\"text-align: left;\">Horizontale Bewegung<\/th>\n<th style=\"text-align: left;\">Vertikales Reisen<\/th>\n<th style=\"text-align: left;\">Drehung<\/th>\n<th style=\"text-align: left;\">Rotationsgeschwindigkeit<\/th>\n<th style=\"text-align: left;\">Boom Elevating<\/th>\n<th style=\"text-align: left;\">Ausleger vorw\u00e4rts<\/th>\n<th style=\"text-align: left;\">Trolley-Geschwindigkeit<\/th>\n<th style=\"text-align: left;\">Bahnabstand<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"text-align: left;\">LH8080<\/td>\n<td style=\"text-align: left;\">8000 mm<\/td>\n<td style=\"text-align: left;\">8000 mm<\/td>\n<td style=\"text-align: left;\">\u00b1180\u00b0<\/td>\n<td style=\"text-align: left;\">0,12 m\/min<\/td>\n<td style=\"text-align: left;\">0,4 m\/min<\/td>\n<td style=\"text-align: left;\">0,12-1,2 m\/min<\/td>\n<td style=\"text-align: left;\">0,2-2 m\/min<\/td>\n<td style=\"text-align: left;\">2700 mm<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">LH4580<\/td>\n<td style=\"text-align: left;\">4500 mm<\/td>\n<td style=\"text-align: left;\">8000 mm<\/td>\n<td style=\"text-align: left;\">\u00b1180\u00b0<\/td>\n<td style=\"text-align: left;\">0,12 m\/min<\/td>\n<td style=\"text-align: left;\">0,4 m\/min<\/td>\n<td style=\"text-align: left;\">0,12-1,2 m\/min<\/td>\n<td style=\"text-align: left;\">0,2-2 m\/min<\/td>\n<td style=\"text-align: left;\">2000 mm<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">LH5060<\/td>\n<td style=\"text-align: left;\">5000 mm<\/td>\n<td style=\"text-align: left;\">6000 mm<\/td>\n<td style=\"text-align: left;\">\u00b1180\u00b0<\/td>\n<td style=\"text-align: left;\">0,12 m\/min<\/td>\n<td style=\"text-align: left;\">0,4 m\/min<\/td>\n<td style=\"text-align: left;\">0,12-1,2 m\/min<\/td>\n<td style=\"text-align: left;\">0,2-2 m\/min<\/td>\n<td style=\"text-align: left;\">2000 mm<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">LH3040<\/td>\n<td style=\"text-align: left;\">3000 mm<\/td>\n<td style=\"text-align: left;\">4000 mm<\/td>\n<td style=\"text-align: left;\">\u00b1180\u00b0<\/td>\n<td style=\"text-align: left;\">0,12 m\/min<\/td>\n<td style=\"text-align: left;\">0,4 m\/min<\/td>\n<td style=\"text-align: left;\">0,12-1,2 m\/min<\/td>\n<td style=\"text-align: left;\">0,2-2 m\/min<\/td>\n<td style=\"text-align: left;\">1500 mm<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">LH1235<\/td>\n<td style=\"text-align: left;\">1200 mm<\/td>\n<td style=\"text-align: left;\">3500 mm<\/td>\n<td style=\"text-align: left;\">Manuell 360\u00b0<\/td>\n<td style=\"text-align: left;\">0,12 m\/min<\/td>\n<td style=\"text-align: left;\">0,4 m\/min<\/td>\n<td style=\"text-align: left;\">0,12-1,2 m\/min<\/td>\n<td style=\"text-align: left;\">Handbuch<\/td>\n<td style=\"text-align: left;\">1000 mm<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>2. Advanced Welding Positioners for Optimal Workpiece Orientation<\/h3>\n<p>Our welding positioners provide synchronized turning, rotating, and tilting for precision welding. They offer 360\u00b0 continuous rotation and 0 to 90\u00b0 tilting with servo-driven control. These systems achieve \u00b10.05 mm positioning accuracy and 0.02 mm repeatability. This makes them suitable for robotic welding cells and automated fabrication.<br \/>\nWenn Sie interessiert sind, schauen Sie unter \u300a<a href=\"https:\/\/www.weldmc.com\/de\/nachrichten\/empowering-pressure-vessel-manufacturing-how-welding-positioners-become-the-core-engine-of-quality-and-efficiency\/2223\/\">Wie Schwei\u00dfpositionierer zum zentralen Motor f\u00fcr Qualit\u00e4t und Effizienz werden<\/a>\u300b.<\/p>\n<h4>Welding Positioner Specifications:<\/h4>\n<table>\n<thead>\n<tr>\n<th style=\"text-align: left;\">Modell<\/th>\n<th style=\"text-align: left;\">Maximale Belastung<\/th>\n<th style=\"text-align: left;\">Neigungsbereich<\/th>\n<th style=\"text-align: left;\">Drehung<\/th>\n<th style=\"text-align: left;\">Positionierungsgenauigkeit<\/th>\n<th style=\"text-align: left;\">Reproduzierbarkeit<\/th>\n<th style=\"text-align: left;\">Kontrollsystem<\/th>\n<th style=\"text-align: left;\">Anwendungen<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"text-align: left;\">1 Tonne 3-Achsen-Positionierer<\/td>\n<td style=\"text-align: left;\">1 Tonne<\/td>\n<td style=\"text-align: left;\">0-90\u00b0<\/td>\n<td style=\"text-align: left;\">360\u00b0 kontinuierlich<\/td>\n<td style=\"text-align: left;\">\u00b10,05 mm<\/td>\n<td style=\"text-align: left;\">0,02 mm<\/td>\n<td style=\"text-align: left;\">Siemens SPS + HMI<\/td>\n<td style=\"text-align: left;\">Automotive, Aerospace, Heavy Equipment, Pressure Vessels<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">2 Tonnen 3-Achsen-Positionierer<\/td>\n<td style=\"text-align: left;\">2 Tonnen<\/td>\n<td style=\"text-align: left;\">0-90\u00b0<\/td>\n<td style=\"text-align: left;\">360\u00b0 kontinuierlich<\/td>\n<td style=\"text-align: left;\">0,05 mm<\/td>\n<td style=\"text-align: left;\">0,02 mm<\/td>\n<td style=\"text-align: left;\">PLC + Touchscreen<\/td>\n<td style=\"text-align: left;\">Automated Welding Cells, Pipe &amp; Flange Welding, Structural Parts<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">3-Achsen-Schwei\u00dfpositionierer 3 Tonnen<\/td>\n<td style=\"text-align: left;\">3000 kg<\/td>\n<td style=\"text-align: left;\">0-90\u00b0<\/td>\n<td style=\"text-align: left;\">360\u00b0 kontinuierlich<\/td>\n<td style=\"text-align: left;\">\u00b10,05 mm<\/td>\n<td style=\"text-align: left;\">0,02 mm<\/td>\n<td style=\"text-align: left;\">PLC and touchscreen<\/td>\n<td style=\"text-align: left;\">Automotive Chassis, Aerospace, Precision Machinery, Robotic Welding<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">Dreifach-Achsen-Positioniertisch 5 Tonnen<\/td>\n<td style=\"text-align: left;\">5000 kg<\/td>\n<td style=\"text-align: left;\">0-90\u00b0<\/td>\n<td style=\"text-align: left;\">360\u00b0 kontinuierlich<\/td>\n<td style=\"text-align: left;\">\u00b10,05 mm<\/td>\n<td style=\"text-align: left;\">0,02 mm<\/td>\n<td style=\"text-align: left;\">PLC and touchscreen<\/td>\n<td style=\"text-align: left;\">Pressure Vessels, Automotive, Structural Steel, Shipbuilding, Robotic SAW<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">30 Tons Adjustable Height Positioner<\/td>\n<td style=\"text-align: left;\">30000 kg<\/td>\n<td style=\"text-align: left;\">0-360\u00b0<\/td>\n<td style=\"text-align: left;\">0-360\u00b0<\/td>\n<td style=\"text-align: left;\">K.A.<\/td>\n<td style=\"text-align: left;\">K.A.<\/td>\n<td style=\"text-align: left;\">AC frequency control<\/td>\n<td style=\"text-align: left;\">Pressure Vessels, Structural Steel, Wind Towers, Heavy Equipment, Tank &amp; Pipe<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">100 Tons Adjustable Height Positioner<\/td>\n<td style=\"text-align: left;\">100000 kg<\/td>\n<td style=\"text-align: left;\">0-135\u00b0<\/td>\n<td style=\"text-align: left;\">0-360\u00b0<\/td>\n<td style=\"text-align: left;\">K.A.<\/td>\n<td style=\"text-align: left;\">K.A.<\/td>\n<td style=\"text-align: left;\">AC frequency control<\/td>\n<td style=\"text-align: left;\">Pressure Vessels, Wind Towers, Heavy Steel Structures<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h3>3. Heavy-Duty Fit-Up Rotators for Seamless Component Assembly<\/h3>\n<p>Our fit-up rotators ensure precise alignment and rotation for large workpieces. The 20 Ton Automatic Fit-Up Rotator, for example, features servo drives and absolute encoders. It delivers 0.2-1.5m\/min precise alignment for 1-4m diameter workpieces with \u00b10.8mm positioning accuracy. Anti-deflection mechanisms and compatibility with automated welding systems are standard.<br \/>\nWenn Sie interessiert sind, schauen Sie unter \u300a<a href=\"https:\/\/www.weldmc.com\/de\/nachrichten\/empowering-giant-projects-how-heavy-duty-welding-rotators-became-the-core-pillar-of-offshore-wind-and-heavy-steel-structure-manufacturing\/2228\/\">Empowering Giant Projects How Heavy Duty Welding Rotators Became The Core Pillar Of Offshore Wind And Heavy Steel Structure Manufacturing<\/a>\u300b.<\/p>\n<h4>Fit-Up Rotator Specifications:<\/h4>\n<table>\n<thead>\n<tr>\n<th style=\"text-align: left;\">Modell<\/th>\n<th style=\"text-align: left;\">Max Combined Load<\/th>\n<th style=\"text-align: left;\">Workpiece Diameter<\/th>\n<th style=\"text-align: left;\">Positionierungsgenauigkeit<\/th>\n<th style=\"text-align: left;\">Geschwindigkeitskontrolle<\/th>\n<th style=\"text-align: left;\">Wesentliche Merkmale<\/th>\n<th style=\"text-align: left;\">Anwendungen<\/th>\n<\/tr>\n<\/thead>\n<tbody>\n<tr>\n<td style=\"text-align: left;\">10-Tonnen-Schwerlast-Montagerotator<\/td>\n<td style=\"text-align: left;\">50 tons<\/td>\n<td style=\"text-align: left;\">1.5-6m<\/td>\n<td style=\"text-align: left;\">\u00b10,5 mm<\/td>\n<td style=\"text-align: left;\">0.1-1.2m\/min<\/td>\n<td style=\"text-align: left;\">Hydraulic lifting, Laser guidance, Remote diagnostic<\/td>\n<td style=\"text-align: left;\">Municipal Pipelines, Pressure Vessel Segments, Construction Machinery<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">20 Ton Automatic Fit-Up Rotator<\/td>\n<td style=\"text-align: left;\">20 tons (single)<\/td>\n<td style=\"text-align: left;\">1-4m<\/td>\n<td style=\"text-align: left;\">\u00b10.8mm<\/td>\n<td style=\"text-align: left;\">0.2-1.5m\/min<\/td>\n<td style=\"text-align: left;\">Servo drives, Anti-deflection, Robot compatibility<\/td>\n<td style=\"text-align: left;\">Wind Towers, Offshore Platforms, Pipeline Girth Welding, Storage Tanks<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">40 Ton Pipe Fit-Up Rotator<\/td>\n<td style=\"text-align: left;\">40 Tonnen<\/td>\n<td style=\"text-align: left;\">1.5-6m<\/td>\n<td style=\"text-align: left;\">\u00b10,5 mm<\/td>\n<td style=\"text-align: left;\">0.1-1.2m\/min<\/td>\n<td style=\"text-align: left;\">Bi-directional hydraulic, Anti-rollover, Seam tracking<\/td>\n<td style=\"text-align: left;\">Subsea Pipelines, Large Vessel Fabrication, Offshore Structures, Pressure Vessels<\/td>\n<\/tr>\n<tr>\n<td style=\"text-align: left;\">60 Ton Fit-Up Rotator Machine<\/td>\n<td style=\"text-align: left;\">60 Tonnen<\/td>\n<td style=\"text-align: left;\">1.5-6m<\/td>\n<td style=\"text-align: left;\">\u00b10,5 mm<\/td>\n<td style=\"text-align: left;\">0.3-3 RPM<\/td>\n<td style=\"text-align: left;\">Laser-guided positioning, Three-stage clamping<\/td>\n<td style=\"text-align: left;\">Pressure Vessels, Heavy Industry<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<h2>Implementation &amp; Process Transformation: From Manual to Automated Excellence<\/h2>\n<p>The transition to the new automated production line involved meticulous planning, installation, and calibration. This ensured smooth integration and optimal performance. Our team worked closely with the client to configure the <a href=\"https:\/\/www.weldmc.com\/de\/product\/schweismanipulator\/\">Manipulator zum Schwei\u00dfen<\/a>s for precise longitudinal and circumferential seam welding. We utilized models like the LH8080 for its extensive reach and accuracy. Various <a href=\"https:\/\/www.weldmc.com\/de\/product\/einstellbare-schweispositioniereinrichtung-30-tonnen\/\">Adjustable Welding Positioner<\/a>s, including the 30 Tons Adjustable Height Positioner and 100 Tons Adjustable Height Positioner, were strategically deployed. They provided synchronized turning, rotating, and tilting. This enabled welders to access optimal angles with ease, significantly reducing setup times. The 20 Ton Automatic Fit-Up Rotator then aligned large wind tower sections with sub-millimeter precision. This eliminated manual adjustments and sped up the assembly phase. This section details the step-by-step implementation process, the training provided, and the operational changes. These changes led to a dramatically more efficient workflow.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.weldmc.com\/wp-content\/uploads\/2025\/11\/Automated-Welding-Positioner_20251130_163400.webp\" alt=\"Automatischer Schwei\u00dfpositionierer\" style=\"max-width: 600px; height: auto; display: block; margin: 20px auto;\" \/><\/p>\n<h2>The Results: A Staggering 300% Increase in Productivity and Enhanced Quality<\/h2>\n<p>The strategic implementation of WUXI ABK&#8217;s automated welding solutions yielded remarkable and quantifiable results. This reshaped the client&#8217;s wind tower production capabilities. Within a short period, the manufacturing line achieved an unprecedented 300% increase in productivity. This drastically cut down production cycle times and enabled the client to meet previously unattainable output targets. This surge in efficiency was accompanied by a significant improvement in weld quality. We attribute this to the precision and consistency of automated processes, which minimized defects and reduced rework. Beyond the primary productivity gains, the automation also led to substantial cost savings. These savings came from reduced labor hours, optimized material usage, and decreased energy consumption. This section presents the hard data and tangible benefits, underscoring the profound impact of WUXI ABK&#8217;s expertise and technology on the client&#8217;s operational and financial performance.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.weldmc.com\/wp-content\/uploads\/2025\/11\/Wind-Tower-Positioner_20251130_163700.webp\" alt=\"Windturm-Positionierer\" style=\"max-width: 600px; height: auto; display: block; margin: 20px auto;\" \/><\/p>\n<h2>Key Takeaways for Modern Wind Tower Manufacturing<\/h2>\n<p>The success of this case study provides invaluable insights for any organization involved in wind tower production or heavy fabrication considering automation. The 300% productivity increase shows the impact of integrating advanced <a href=\"https:\/\/www.weldmc.com\/de\/product\/schweismanipulator\/\">Manipulator zum Schwei\u00dfen<\/a>s, positioners, and rotators into a cohesive production line. Key takeaways include the importance of a holistic approach to automation. Each piece of equipment is selected and configured to complement the others, creating a synergistic effect. The case also shows that efficiency gains are not just about speed. They also involve improving weld quality, enhancing worker safety, and optimizing resource utilization. This section offers forward-looking advice on how manufacturers can leverage similar strategies. This helps them achieve their own production milestones and maintain a competitive edge in the rapidly evolving renewable energy sector.<\/p>\n<p><img decoding=\"async\" src=\"https:\/\/www.weldmc.com\/wp-content\/uploads\/2025\/11\/welding-rotator-suppliers_20251130_163656.webp\" alt=\"welding rotator suppliers\" style=\"max-width: 600px; height: auto; display: block; margin: 20px auto;\" \/><\/p>\n<h2>Call to Action<\/h2>\n<p>Ready to revolutionize your wind tower production line and achieve similar unprecedented productivity gains? Contact WUXI ABK MACHINERY CO., LTD today for a consultation. Our experts are prepared to assess your current operations and design a customized automated welding solution tailored to your specific needs. Visit our website or call us directly to learn more about our welding equipment and how we can help you achieve a 300% (or more!) increase in your manufacturing efficiency.<br \/>\nMobil: +86-13815101750<br \/>\nE-Mail: jay@weldc.com<\/p>\n<h2>FAQs<\/h2>\n<h3>1. What specific WUXI ABK equipment was instrumental in achieving the 300% productivity increase?<\/h3>\n<p>The core equipment included advanced Welding Manipulators (e.g., LH8080), various Welding Positioners (e.g., 30 Tons Adjustable Height Positioner, 100 Tons Adjustable Height Positioner), and Heavy-Duty Fit-Up Rotators (e.g., 20 Ton Automatic Fit-Up Rotator). Each played a key role in automating different stages of the wind tower fabrication process, from precise seam welding to efficient component assembly.<\/p>\n<h3>2. How does WUXI ABK ensure the quality of welds in an automated wind tower production line?<\/h3>\n<p>Our automated solutions integrate high-precision control systems, such as Siemens PLC with HMI touchscreens, and utilize advanced components like servo-driven motors and precision reducers. This ensures consistent welding parameters, optimal workpiece positioning, and reduced human error, leading to significantly improved weld quality and fewer defects compared to manual processes.<\/p>\n<h3>3. Can WUXI ABK&#8217;s automated solutions be adapted for different sizes and types of wind tower components?<\/h3>\n<p>Yes, WUXI ABK offers a wide range of customizable welding equipment designed to handle various dimensions and weights. Our Welding Manipulators have extensive reach, and our Welding Positioners and Rotators come in different load capacities (e.g., from 1 ton to 300 tons) and adjustable features, allowing for flexible adaptation to diverse wind tower component specifications.<\/p>\n<h3>4. What is the typical return on investment (ROI) for implementing an automated wind tower production line?<\/h3>\n<p>While specific ROI varies based on initial investment and existing inefficiencies, case studies like this demonstrate substantial returns. The 300% productivity increase translates into significant cost savings from reduced labor, faster production cycles, improved quality, and increased output capacity, leading to a rapid payback period and enhanced profitability for manufacturers.<\/p>\n<h3>5. Beyond productivity, what other benefits did the wind tower manufacturer experience with WUXI ABK&#8217;s automated system?<\/h3>\n<p>In addition to the dramatic productivity increase, the manufacturer experienced enhanced weld quality, reduced material waste, improved worker safety by minimizing exposure to hazardous welding environments, and greater operational consistency. These benefits collectively contributed to a stronger competitive position and increased capacity to meet market demand.<\/p>","protected":false},"excerpt":{"rendered":"<p>Manual welding has long held wind tower lines back: uneven quality, drawn-out cycles, and heavy labor costs. In this case, replacing those bottlenecks with an integrated automated welding line built around Welding Manipulators, Positioners, and Fit-Up Rotators delivered a 300% productivity jump alongside better weld integrity and lower operating costs. The sections below cover the [&hellip;]<\/p>","protected":false},"author":1,"featured_media":2577,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"_acf_changed":false,"footnotes":""},"categories":[1],"tags":[],"class_list":["post-2552","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-news"],"blocksy_meta":[],"acf":[],"_links":{"self":[{"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/posts\/2552","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/comments?post=2552"}],"version-history":[{"count":3,"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/posts\/2552\/revisions"}],"predecessor-version":[{"id":2666,"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/posts\/2552\/revisions\/2666"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/media\/2577"}],"wp:attachment":[{"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/media?parent=2552"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/categories?post=2552"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/www.weldmc.com\/de\/wp-json\/wp\/v2\/tags?post=2552"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}